Ocena gotowości wybranego systemu transportowego
Evaluation of readiness of selected transport system
Abstract
The basic tasks of the public public transport operator include reliable and safe transport services under the concluded transport contract with the transport organizer. The entity acting as the operator is obliged to punctually adhere to timetables, it is possible provided that the operator has a rolling stock characterized by a high level of readiness for rolling stock. The paper attempts to assess the readiness of the public transport operator performing tasks in the city and the adjacent area with a total number of residents not exceeding one hundred thousand.
References
J. Chaciński, Z. Jędrzejewski: Gospodarstwo samochodowe, organizacja, eksploatacja zaplecze techniczne. WKŁ Warszawa 1979.
O. Wyszomirski, K. Grzelec, Badania marketingowe w komunikacji miejskiej, Izba Gospodarcza Komunikacji Miejskiej Warszawa 1998r .
Praca zbiorowa pod redakcją T. Szczepanika, 1996. Transport i spedycja międzynarodowa. PWE, Warszawa.
Praca zbiorowa pod redakcją W. Rydzkowskiego i K. Wojewódzkiej-Król, 1998. Transport. PWN, Warszawa.
Rozporządzenie Ministra Infrastruktury z dnia 25 maja 2011 r. w sprawie szczegółowego zakresu planu zrównoważonego rozwoju publicznego transportu zbiorowego.
Ustawa z dnia 16 grudnia 2010 r. o publicznym transporcie zbiorowym (Dz. U. z 2011 r. Nr 5, poz. 13 oraz z 2011 r. Nr 228, poz. 1368).
Woropay M., Knopik L., Landowski B., 2001. Modelowanie procesów eksploatacji w systemie transportowym. ITE, Bydgoszcz – Radom.
Copyright (c) 2018 Autobusy – Technika, Eksploatacja, Systemy Transportowe
This work is licensed under a Creative Commons Attribution 4.0 International License.